亚洲国产精品国自产拍久久-xxxx在线视频-亚洲欧美一区中文字幕蜜臀-天天干天天天天-天天看天天爽-国产精品污视频-亚洲成人播放-日韩国产综合精选-在线观看国产精品视频-精品av熟女一区二区偷窥海滩-欧美视频中文字幕-91九色性视频-久久精品麻豆日日躁夜夜躁-国内精品视频一区-九九九九热-他也色在线视频-操的好爽视频

CN EN

NEWS

The role of power transformers

Power transformers are one of the main equipment for power plants and substations. The role of the transformer is not only to increase the voltage to send electricity to the electricity area, but also to reduce the voltage to the voltage used at each level to meet the needs of electricity. In short, both boost and buck must be done by a transformer. In the process of transmitting electrical energy in the power system, voltage and power losses are inevitably generated. When the same power is delivered, the voltage loss is inversely proportional to the voltage, and the power loss is inversely proportional to the square of the voltage. Using a transformer to increase the voltage reduces the loss of power transmission.
Transformer is composed of two or more coil windings wound on the same core, the windings are connected by alternating magnetic field and work according to the principle of electromagnetic induction. The installation location of the transformer should be considered for easy operation, maintenance and transportation, and a safe and reliable place should be chosen. The rated capacity of the transformer must be reasonably selected when using the transformer. When the transformer is running at no load, a large amount of reactive power is required. These reactive powers are supplied by the power supply system. If the capacity of the transformer is too large, it not only increases the initial investment, but also makes the transformer run at no load or light load for a long time, which increases the proportion of no-load loss, reduces the power factor, and increases the network loss. This operation is neither economical nor reasonable. If the transformer capacity selection is too small, the transformer will be overloaded for a long time and the equipment will be damaged. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.
2019/06/03 13:48:46 5672 次

Related Documents

Contact:Mr. YuanTel:+86-510-87846969 Fax:+86-510-87848616
E-mail:yxwb@vip.163.comAdd:Wanshi Town Industrial Concentration Zone, Yixing City, Jiangsu
Copy right ? 2019 Yixing Wansheng Transformer Co., Ltd.
中牟县| 永德县| 广饶县| 大洼县| 临汾市| 兰溪市| 绥芬河市| 宁都县| 河西区| 民丰县| 孝昌县| 辽阳市| 贡觉县| 盐边县| 丰顺县| 南投市| 荔浦县| 长丰县| 多伦县| 莒南县| 九龙县| 象州县| 华容县| 斗六市| 西城区| 鱼台县| 五原县| 昌江| 田阳县| 东莞市| 惠来县| 镇沅| 城步| 容城县| 白水县| 扎兰屯市| 库车县| 林周县| 夹江县| 馆陶县| 全南县|